Pre-Trial Run of Metro Train Begins on Iconic Model Road in Gandhinagar
The completion of the second phase of the metro train service from Motera to Gandhinagar Gift City, a dream project of Prime Minister Narendra Modi, is being diligently monitored. The inauguration ceremony for running the metro train from Motera Stadium to Gandhinagar Gift City under the Metro Rail Phase-Two project is being organized. The Gujarat Metro Rail Corporation is making rapid progress towards completing the project. An iconic model road on Route 32 of Patan Nagar Gandhinagar, built at a cost of 32 crores, is being utilized for the pre-trial run of the metro train.
Train Passes in Front of Late Prime Minister’s Mother’s Residence
Today, the metro train passed in front of the residence of the late Prime Minister Modi’s mother, Hiraba, near the track adjacent to the Rayasan Vrindavan Bungalow. The pre-trial run of the metro train took place on a route of approximately two and a half kilometers. This sight left everyone mesmerized. It is noteworthy that the pre-trial run of the metro train is expected to take place in the coming months on the Koba-Rayasan route.
Trial Run of Metro Train Possible in March-April
There is a possibility of conducting the trial run of the metro train from Motera Stadium to Gandhinagar Sector-1 in March-April. Gujarat Metro Rail Corporation is swiftly working towards conducting the pre-trial run of the metro train on the Koba-Rayasan route. This demonstrates the Gujarat Metro Rail Corporation’s commitment to completing the project efficiently.
Progress of Construction of 23 Spans of Shahpur Bridge
A while ago, Chief Minister Bhupendra Patel inspected the progress of railway routes and station construction under the Ahmedabad-Gandhinagar Metro Rail Project Phase Two (Motera to Gandhinagar) after meeting with various stakeholders. He also reviewed the progress of the work. Following this, the construction of the metro train in Gandhinagar began at a rapid pace. The construction work of 23 spans of Shahpur Bridge (each 44.80 meters long) near the Gift City, located near the Sabarmati River, is progressing satisfactorily.
Rail Track, Platform, and Power Supply Work in Full Swing
Every span of work is being carried out productively every day. Alongside rail track, metro platform, third rail for power supply, and signal work are also progressing smoothly. The trial runs of metro trains are set to commence rapidly in March-April. During this time, people traveling from Ahmedabad to Gift City via the metro train will experience much convenience.
Residents of Patan to Enjoy Metro Rides Soon
The residents of Patan eagerly anticipate the imminent realization of metro services. Work is underway for the final touch-ups of the construction between Motera Narendra Modi Stadium and Gandhinagar Sector-1 (CH-2 Station) and the 20-kilometer route to Gift City. The inauguration of metro rail is scheduled to coincide with the upcoming Lok Sabha elections. Work is underway round the clock for this.
Motera to Gandhinagar: 22 Stations
It’s noteworthy that the Motera to Gandhinagar route will have 22 stations, all equipped with essential facilities. The final touches of metro station construction are progressing towards completion at stations including Koteshwar Road, Vishwakarma College, Tapovan Circle, Narmada Canal, Koba Circle, Old Koba, Koba Village, GNLU, PDPU, Gift City, Raysan, Randesan, Dhola Kuva Circle, Infocity, Sector-1, Sector-10A, Sachivalaya, Akshardham, Old Sachivalaya, Sector-16, Sector-24, and Mahatma Mandir.
Metro Rail’s Pre-Trial Runs in March-April
Pre-trial runs of the metro rail are set to begin in Gandhinagar before March-April. Today, a pre-trial run of the metro train was conducted from Koba Station to Raysan. The trial run of the train on Iconic Model Road of Gandhinagar was witnessed by all, leaving them spellbound. The excitement among the residents of Gandhinagar is reaching its peak as the days draw nearer.